Applications & Jobs
Headland Levelling
Headlands often develop ruts and ridges from repeated turns. Repair must preserve the connection between crop rows, field drainage and machinery access.

Plan the surface handover
BeforeInspect the damage after harvest and locate irrigation services.
Work stageMove suitable soil from ridges to deficits in controlled passes; avoid spreading subsoil across the growing layer.
AfterRestore the seedbed or traffic surface required for the next season.
What to verify
Check that repaired turn areas do not dam row-end drainage.
A useful application brief names the material, work extent, source and receiving locations, available tractor and surface required next. Select a controlled soil-moving method only after those details are clear. The illustrated configuration is a concept; rental suitability is confirmed for the supplied unit.
Scope and limits
Wet ground or persistent weak support may require a different repair window or method.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
