Applications & Jobs
Road-Base Preparation
Road-base preparation controls a specified aggregate layer, not ordinary topsoil. Even distribution and the right shape help the compaction and surfacing operations that follow.

Plan the surface handover
BeforeConfirm aggregate type, accepted subgrade and planned layer thickness.
Work stagePlace and grade material without segregating it or burying uncorrected formation defects.
AfterCompact and complete the project's layer-acceptance checks.
What to verify
Measure levels and thickness at representative locations and transitions.
A useful application brief names the material, work extent, source and receiving locations, available tractor and surface required next. Select a controlled soil-moving method only after those details are clear. The illustrated configuration is a concept; rental suitability is confirmed for the supplied unit.
Scope and limits
Do not use a nominal scraper load count as evidence of compacted layer depth.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
