Subgrade Preparation

Subgrade preparation creates the surface that supports the next pavement or structural layer. The visible level and the condition of the material both matter.

Red scraper preparing a rugby ground — application concept
Red scraper preparing a rugby ground · Supplied application concept

Plan the surface handover

BeforeRemove unsuitable material according to the project instructions and establish the formation reference.
Work stageTrim and redistribute suitable material without mixing layers or leaving loose isolated pockets.
AfterPrepare for the specified compaction and acceptance process.

What to verify

Check levels, moisture and soft areas before the next layer is placed.

A useful application brief names the material, work extent, source and receiving locations, available tractor and surface required next. Select a controlled soil-moving method only after those details are clear. The illustrated configuration is a concept; rental suitability is confirmed for the supplied unit.

Scope and limits

A geometric check cannot replace material testing.