Cambodia laser levelling — service scope, quote and handover
A useful levelling quote states the area, survey, intended surface, estimated material movement and what the service includes. Ask how both parties will check completion before agreeing a rate.
Historical demonstration context
IRRI reported laser-levelling demonstrations in Cambodia in 2012, including work in Battambang, Kandal and Kampot. That history offers context for a service-provider discussion. Equipment and production figures from those demonstrations apply to the documented setups.
Describe the work in the quote
| Item | Information to agree |
|---|---|
| Field and survey | Area, benchmark, high/low points, target surface, inlet and outlet. |
| Earth movement | Cut volume, fill requirement, topsoil handling and typical haul distance. |
| Working time | Mobilisation, preparation, working hours, turning and level checks included in the rate. |
| Machine and operator | Tractor, scraper model, receiver/control package, operator and site access. |
| Handover | Check locations, agreed acceptance criteria and record of outstanding work. |
Dugong model enquiry
| Model and guide | Nominal capacity | Approx. cubic yards | Working width | Rated tractor power (up to) |
|---|---|---|---|---|
| Dugong 900 | 0.30 m³ | 0.39 yd³ | Confirm current unit | Up to 30 hp / approx. 22.4 kW |
| Dugong 1200 | 0.45 m³ | 0.59 yd³ | Confirm current unit | Up to 30 hp / approx. 22.4 kW |
| Dugong 1400 | 0.65 m³ | 0.85 yd³ | Approx. 1.35 m / 4.43 ft in the saved model overview; confirm unit | Up to 35 hp / approx. 26.1 kW |
These supplied nominal capacities support initial planning. The source pages label them as nominal capacity. The owner confirms ratings up to 30 hp for the 900, 30 hp for the 1200 and 35 hp for the 1400. Confirm current dimensions, mass, hydraulic connections and permitted loads for the proposed rental unit.
Use the supplied capacities and owner-confirmed tractor ratings as the starting information for a specific configuration enquiry. Rates, freight, dates and any Cambodian service arrangement require confirmation.
Use the detailed tractor-fit checklist · Review the illustrative time calculation · មគ្គុទ្ទេសក៍ជាភាសាខ្មែរ
Sources and further reading
Train Productivity
Updated 2026-11-19