Pre-Hot-Mix Grading

Pre-hot-mix grading prepares the layer beneath asphalt. Asphalt should not be expected to cure broad formation errors or drainage reversals.

Red scraper preparing a rugby ground — application concept
Red scraper preparing a rugby ground · Supplied application concept

Plan the surface handover

BeforeConfirm the accepted layer, finished road profile and surfacing allowance.
Work stageCorrect local deviations while keeping the base material and edge geometry consistent.
AfterComplete compaction and inspection before asphalt placement.

What to verify

Check transitions at joints, gutters and existing pavement.

A useful application brief names the material, work extent, source and receiving locations, available tractor and surface required next. Select a controlled soil-moving method only after those details are clear. The illustrated configuration is a concept; rental suitability is confirmed for the supplied unit.

Scope and limits

Dugong can help prepare suitable ground; it is not an asphalt paver or compactor.

Continue the job brief

Discuss this work

Include the location, existing condition, intended surface, material, available tractor and proposed dates.