Applications & Jobs
Pre-Paving Grading
Pre-paving grading sets the profile below the finished paving system. Its target must allow for the planned bedding and paving thickness rather than equal the finished top level.

Plan the surface handover
BeforeConfirm thresholds, finished surface levels and layer thicknesses.
Work stageCorrect the supporting layer and preserve drainage gradients through junctions.
AfterComplete compaction and place the specified bedding and paving system.
What to verify
Check the difference between formation level and finished level.
A useful application brief names the material, work extent, source and receiving locations, available tractor and surface required next. Select a controlled soil-moving method only after those details are clear. The illustrated configuration is a concept; rental suitability is confirmed for the supplied unit.
Scope and limits
Paving details and tolerances must come from the project specification.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
