Cut, Collect, Carry, Place & Grade
Dugong's cut, collect, carry, place and grade sequence should be planned around the job's actual material route. Filling a bowl is not the end of the task; placing material correctly and checking the surface are part of the cycle.

Plan the surface handover
What to verify
Include empty return and turning time when estimating the cycle.
Dugong rental suitability is assessed for the actual job and supplied configuration. Describe the tractor, material, route, receiving use and work period. Supply and transport arrangements are confirmed at enquiry; illustrated applications do not establish a completed project or available attachment.
The workflow does not promise a universal hourly production rate.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
