How the Dugong Works
The Dugong workflow separates material collection from its final placement. Once suitable material is loaded, it can be carried to the receiving area and then graded into the required surface.

Plan the surface handover
What to verify
Compare source and receiving levels after movement.
Dugong rental suitability is assessed for the actual job and supplied configuration. Describe the tractor, material, route, receiving use and work period. Supply and transport arrangements are confirmed at enquiry; illustrated applications do not establish a completed project or available attachment.
Operating instructions for the supplied configuration take precedence over a general website explanation.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
