Cotton Land Grading
Cotton grading often needs to connect rows, headlands and tail drainage. Repairing a low area without considering the row system can create another restriction downstream.

Plan the surface handover
What to verify
Check continuity into tail drains and through machinery turning areas.
Field formation precedes the crop-specific seedbed or bed-making operation. Protect productive soil, check the whole water route and coordinate headlands with machinery access. A before-and-after photograph can show shape, but does not establish a crop or irrigation benefit without appropriate observations.
Avoid moving unsuitable subsoil into the productive growing layer.
Continue the job brief
Include the location, existing condition, intended surface, material, available tractor and proposed dates.
