This guide focuses on water point drainage as a water-management work decision. The useful starting point is the condition required for the next irrigation, drainage event or field operation, not simply the amount of material a machine can move.
Write down what must happen after the work: the next irrigation, drainage event or field operation. That determines whether the target is level, fall, crossfall, crown, drainage relief, local correction or general surface preparation.
Check soil/material type, moisture, topsoil and subsoil, compaction history, existing drainage, buried or nearby infrastructure, access, tractor traction and room to turn.
Do not automatically disturb the whole area because one section has changed. Plan local correction where appropriate, staged work where useful, or a complete regrade where the overall surface has lost its intended relationship.
Provide measurements, photographs or survey information where available, the tractor details and the desired result. This makes machine suitability easier to assess before transport is arranged.
If an existing Dugong configuration may suit the job, describe the area, tractor, material, intended result and location.
Existing-machine rental and application information belongs here. Development of a new width, material or specialised machine configuration belongs with Frank’s Final Grade.